Register a free account today to become a member! Once signed in, you'll be able to participate on this site by adding your own topics and posts, as well as connect with other members through your own private inbox!
Only if you're going with the full flow job, and i'd only do that if I could be doing with the hassle of flow benching to get all four matched. If you only do the manifold:head meeting points, well, best way to describe it would be to picture a 2" pipe, leading to a 3" pipe then back to a 2" pipe. The 3" bit in the middle is made redundant by the fact the lead in and lead out is 2".
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.