New gearbox mount arrived so took the leg off and cleaned it up. It was missed from blasting for some reason.
Took the others off too and lobbed some paint around
Checked the new wishbones & bolts fit, wishbones complete with bushes and balljoints for under forty quid off Autodoc for both - ridiculous.
Looked at starting the fuel system & tank install, cleaned up the filler neck and found this on the breather
Iv'e replaced it with straight copper pipe which is just the right size, trimmed the pipe ends, I think I can stretch the inch or so of pipe I have lost out of the routing.
Started making a rubber mounted bracket for the new fuel pump, the old one was ziptied to the chassis so the bracketry has disintegrated in years past. The M6 captives still seem OK though. These rubber bushed things used to hold the ECU in the 21, so I repurposed them.
This will be lined with rubber sheet too
Cleaned up and painted the brake master while I had the paint stuff out, this can be refitted after a couple of coats of black. I did find a new one but he wanted too much money for it, so i'll stick with the original
