arno samimi
Active Member
and now the steering wheel and the instruments.
it looked so far:

steering wheel off in a second, instruments in 10 minutes:

disassemble:



open the instruments:

pointer away:

cover:

paint matt black:



attach the pointer again:

calibrate, test:



new rings in matt black:

exchange:



before assembling treated with anti-fog agents, because in a spider the instruments are exposed to the weather:

glasses on it:

In housing and ready for Installation:

disassemble steering wheel:







the steering wheel is back from the saddlery.
covered with the same leather of the R26R seats, with a light gray center mark, matching the matte silver from the interior,
the seams identical the seats in a simple black (otherwise rapid soiling, because open vehicle):



electronic module installed:

the "new" instruments also provides for the Installation:

instruments mounted:

and steering wheel snapped again, finished:

it looked so far:

steering wheel off in a second, instruments in 10 minutes:

disassemble:



open the instruments:

pointer away:

cover:

paint matt black:



attach the pointer again:

calibrate, test:



new rings in matt black:

exchange:



before assembling treated with anti-fog agents, because in a spider the instruments are exposed to the weather:

glasses on it:

In housing and ready for Installation:

disassemble steering wheel:







the steering wheel is back from the saddlery.
covered with the same leather of the R26R seats, with a light gray center mark, matching the matte silver from the interior,
the seams identical the seats in a simple black (otherwise rapid soiling, because open vehicle):



electronic module installed:

the "new" instruments also provides for the Installation:

instruments mounted:

and steering wheel snapped again, finished:
